Complete electrical installation works for the EV charging infrastructure at the First Bus Caledonia Depot. Scope of works included the installation of all containment systems, power and data cabling, and EV charging equipment throughout the depot. Additional works involved the termination and connection of LV panels, testing and commissioning, and ensuring full integration of the charging infrastructure within the existing electrical network.